Engineering cost efficiencies were a high priority for this 3-level, $79M new high school. Due to poor soils at the second site, engineering for a geo-pier base system was required. The school features an open-web steel joist and masonry system for one-half of the school, and steel framing with BRB frames for the remaining half.
Architecture: FFKR
General Contractor: Westland